Buildings & Structural
Seismic Retrofit and Soft-Story Ordinances
Engineering for mandatory soft-story and other seismic retrofits, including Los Angeles and San Francisco programs. Typical US fees run $10,000 to $60,000 per building, and most projects take Months; city programs set multi-year compliance timelines. Our team prepares the drawings, calculations and reports, and a Professional Engineer (PE) licensed in the state where your project is located reviews and seals them before they go to permit.

What the work involves
Soft-story buildings, often wood-frame apartments with parking or open space at ground level, can collapse in earthquakes. Los Angeles Ordinance 183893 (2015) requires retrofit of pre-1978 wood-frame soft-story buildings of two or more stories (with exemptions for small residential buildings of three or fewer units) and also addresses non-ductile concrete buildings. San Francisco's Mandatory Soft Story Program (2013) covers pre-1978 wood-frame buildings with five or more units and three or more stories. Engineers evaluate the building, design steel moment frames, shear walls and foundations, and support permits and construction.
When you need it
- City issued a mandatory retrofit order
- Wood-frame building with tuck-under parking or open ground floor
- Non-ductile concrete building in a program
- Voluntary retrofit before purchase or refinance
What you receive
- Seismic evaluation
- Retrofit drawings and calculations
- Permit submittals
- Construction observation
What drives the cost
Estimate for engineering. Construction costs are separate and typically much higher.
Frequently asked questions
How much does seismic Retrofit and Soft-Story Ordinances cost?
Across the US, seismic Retrofit and Soft-Story Ordinances usually costs $10,000 to $60,000 per building. Estimate for engineering. Construction costs are separate and typically much higher.
How long does seismic Retrofit and Soft-Story Ordinances take?
Plan on Months; city programs set multi-year compliance timelines from signed proposal to stamped deliverables, longer if a site visit, soil testing or a permit review cycle is involved.
Do I need a licensed PE for seismic Retrofit and Soft-Story Ordinances?
In most US jurisdictions, yes. When the work needs a permit, the plans, calculations or report usually must be sealed by a Professional Engineer licensed in the state where the project is located. Anything we prepare for permit goes to a PE licensed in that state, who reviews and seals it before you submit.
Will I also need a structural engineer?
Sometimes. Depending on the site, seismic Retrofit and Soft-Story Ordinances can also involve a structural engineer, geotechnical engineer or general contractor. We tell you up front which other professionals your project needs and coordinate with them so the drawings agree.
Who do you provide seismic Retrofit and Soft-Story Ordinances for?
This service is typically for business owners, attorneys and municipalities. Describe your project and we will reply with scope, fee and schedule.
Which LA buildings are covered?
Wood-frame buildings of two or more stories built under codes before January 1, 1978 with ground floor parking or similar open space, with exemptions for some small residential buildings, per LADBS. LADBS sends orders to owners of identified buildings.
What are LA's deadlines?
From the order, owners have 2 years to submit plans or a report, 3.5 years to obtain a permit and 7 years to complete work, per LADBS. Missing deadlines can lead to enforcement action.
Can tenants be charged for retrofit costs?
Los Angeles and other rent-controlled cities have specific pass-through rules. Consult local housing regulations.
Does a retrofit stop all damage?
Retrofits are aimed at preventing collapse and improving life safety, not eliminating all damage. Some damage may still occur in a strong earthquake.