Access design and permit applications for commercial entrances onto city, county or state DOT roads. Typical US fees run $2,000 to $30,000, and most projects take 1 to 6 months including DOT review. Our drawings, calculations and reports are sealed by a Professional Engineer (PE) licensed in the state where your project is located, ready for permit submission.

What the work involves
Commercial entrances require an access permit from the road owner. The engineer designs driveway width, radii, sight distance, turn lanes, drainage and pavement, and prepares the application, sometimes supported by a traffic study. Many state DOTs have access management rules that limit driveway spacing and may require shared or right-in, right-out access.
When you need it
- New commercial entrance on a public road
- Change of use that increases traffic
- Agency requires a turn lane
- Frontage on a state highway
- Relocating or closing existing driveways
What you receive
- Access plan
- Sight distance analysis
- Turn lane design
- Permit application exhibits
What drives the cost
Estimate. Simple city curb cuts cost less; state highway access with turn lanes costs more.
Related calculators
Frequently asked questions
How much does commercial Driveway and State Highway Access Permit cost?
Across the US, commercial Driveway and State Highway Access Permit usually costs $2,000 to $30,000. Estimate. Simple city curb cuts cost less; state highway access with turn lanes costs more.
How long does commercial Driveway and State Highway Access Permit take?
Plan on 1 to 6 months including DOT review from signed proposal to stamped deliverables, longer if a site visit, soil testing or a permit review cycle is involved.
Do I need a licensed PE for commercial Driveway and State Highway Access Permit?
In most US jurisdictions, yes. When the work needs a permit, the plans, calculations or report usually must be sealed by a Professional Engineer licensed in the state where the project is located. Every deliverable we issue for permit is sealed that way.
Will I also need a traffic engineer?
Sometimes. Depending on the site, commercial Driveway and State Highway Access Permit can also involve a traffic engineer or land surveyor. We tell you up front which other professionals your project needs and coordinate with them so the drawings agree.
Who do you provide commercial Driveway and State Highway Access Permit for?
Most of our clients for this service are business owners and developers. Describe your project and one of our engineers will reply with scope, fee and schedule.
Why would DOT deny or limit my driveway?
Common reasons are inadequate sight distance, spacing too close to other driveways or intersections, or safety concerns. Agencies may require shared access or turning restrictions.
Do I need a turn lane?
It depends on traffic volumes, speeds and agency warrants. A traffic study often determines it.
How long does a DOT access permit take?
Simple permits may take weeks; permits requiring roadway improvements often take months. Pre-application meetings can shorten the process.
Can neighboring businesses share a driveway?
Yes, and many agencies encourage shared access with a recorded cross-access easement. Shared access can make approval easier.