Drainage, Stormwater & Flood
Stormwater Management Plan
Engineered stormwater plan and report showing how a project controls runoff volume, peak flow and water quality. Typical US fees run $3,000 to $40,000, and most projects take 2 to 8 weeks. Our drawings, calculations and reports are sealed by a Professional Engineer (PE) licensed in the state where your project is located, ready for permit submission.

What the work involves
When a project adds impervious surface or disturbs land above local thresholds, a civil engineer prepares a stormwater management plan with hydrologic calculations, detention or retention design, water quality treatment and maintenance requirements. Design storms are typically based on NOAA Atlas 14 precipitation data. Municipal separate storm sewer (MS4) permits push many cities to require these plans for development and redevelopment.
When you need it
- New development or redevelopment above the local impervious or disturbance threshold
- Planning board requires stormwater report
- Downstream flooding concerns
- Water quality treatment required (for example, impaired waters)
- Expanding a parking lot or building
What you receive
- Stormwater management report with calculations
- Detention or retention facility design
- Water quality treatment design
- Operation and maintenance plan
- Plan sheets
What drives the cost
Estimate. Small residential reports cost a few thousand dollars; commercial projects with detention and treatment cost more. Municipal stormwater review fees are separate and often tiered by acreage.
Related calculators
Frequently asked questions
How much does stormwater Management Plan cost?
Across the US, stormwater Management Plan usually costs $3,000 to $40,000. Estimate. Small residential reports cost a few thousand dollars; commercial projects with detention and treatment cost more. Municipal stormwater review fees are separate and often tiered by acreage.
How long does stormwater Management Plan take?
Plan on 2 to 8 weeks from signed proposal to stamped deliverables, longer if a site visit, soil testing or a permit review cycle is involved.
Do I need a licensed PE for stormwater Management Plan?
In most US jurisdictions, yes. When the work needs a permit, the plans, calculations or report usually must be sealed by a Professional Engineer licensed in the state where the project is located. Every deliverable we issue for permit is sealed that way.
Will I also need a land surveyor?
Sometimes. Depending on the site, stormwater Management Plan can also involve a land surveyor, geotechnical engineer or landscape architect. We tell you up front which other professionals your project needs and coordinate with them so the drawings agree.
Who do you provide stormwater Management Plan for?
Most of our clients for this service are developers, contractors, business owners and municipalitys. Describe your project and one of our engineers will reply with scope, fee and schedule.
What triggers a stormwater management plan?
Local codes set thresholds by disturbed area or added impervious surface. Many tie to the 1 acre federal construction permit threshold, and some cities use much smaller ones.
Is this the same as a SWPPP?
No. A SWPPP manages pollution during construction. A stormwater management plan addresses permanent runoff after construction.
What rainfall data do engineers use?
Most use NOAA Atlas 14 precipitation frequency estimates unless a local standard applies. NOAA's Precipitation Frequency Data Server provides point estimates for most of the US.
Who maintains the stormwater facility?
Usually the property owner, under a recorded maintenance agreement with the jurisdiction. Neglected facilities can be cited by the jurisdiction during inspections.