Phase I Environmental Site Assessment

ASTM E1527-21 Phase I ESA to identify contamination risk before buying or financing commercial property.

Typical US fee$1,500 to $5,000
Typical timeline2 to 4 weeks
Licensing boardSouth Dakota Board of Technical Professions

What the work involves

A Phase I ESA reviews historical records, regulatory databases, site reconnaissance and interviews to identify recognized environmental conditions. Performed to ASTM E1527-21 and EPA's All Appropriate Inquiries rule, it helps buyers qualify for CERCLA liability protections and is commonly required by commercial lenders. It is performed by an environmental professional, who may or may not be a civil engineer.

Local conditions we plan for

  • Deep frost penetration
  • Expansive clay soils (Pierre Shale)
  • Riverine flooding
  • Snow and wind loads

Building code: 2021 IBC/IRC adopted at the state level (ICC adoption chart, April 2026). A legislative summary reports adoption of the 2024 IBC and IRC effective July 1, 2026.

When you need it

  • Buying commercial or industrial property
  • Lender requires a Phase I
  • Former gas station, dry cleaner or industrial use
  • Redevelopment of a brownfield

Frequently asked questions

How much does phase I Environmental Site Assessment cost?

Across the US, phase I Environmental Site Assessment usually costs $1,500 to $5,000 per site. Estimate from consultant and cost-guide sources, which commonly report about $1,500 to $5,000 for typical sites and more for large or complex ones.

How long does phase I Environmental Site Assessment take?

Plan on 2 to 4 weeks from signed proposal to stamped deliverables, longer if a site visit, soil testing or a permit review cycle is involved.

Is a permit required for phase I Environmental Site Assessment?

Often not on its own, but the findings frequently lead to work that does need a permit. We tell you which parts of the follow-up work your local building department will review, and can prepare those drawings too.

How do I verify an engineer's license in South Dakota?

Engineers practicing in South Dakota are licensed by the South Dakota Board of Technical Professions.

Which building code applies in South Dakota?

2021 IBC/IRC adopted at the state level (ICC adoption chart, April 2026). A legislative summary reports adoption of the 2024 IBC and IRC effective July 1, 2026. Cities and counties can add local amendments, which is one reason to hire an engineer who works in your area.

What site problems do engineers see most in South Dakota?

Common issues include deep frost penetration, expansive clay soils (Pierre Shale), riverine flooding and snow and wind loads.