Wisconsin
Lead Service Line Inventory and Replacement Program
Engineering support for water systems to inventory and replace lead service lines under EPA's lead rules.
What the work involves
EPA's Lead and Copper Rule Improvements require community water systems to maintain service line inventories and replace lead and galvanized requiring replacement lines, generally within 10 years with limited exceptions. Engineers help build inventories from records and field verification, prioritize work, design replacement contracts, apply for funding and oversee construction.
Local conditions we plan for
- Deep frost penetration
- Heavy snow loads
- Great Lakes shoreline erosion
- Karst in the southwest Driftless Area and Door County
Building code: IBC 2021 statewide for commercial buildings; one and two family dwellings use the state Uniform Dwelling Code instead of the IRC (ICC adoption chart, April 2026).
When you need it
- Water system must update its service line inventory
- Planning a replacement program
- Applying for state revolving fund or other funding
- Construction oversight for replacements
Frequently asked questions
How much does lead Service Line Inventory and Replacement Program cost?
Across the US, lead Service Line Inventory and Replacement Program usually costs $20,000 to $500,000 per program. Estimate. Depends heavily on system size and number of unknown lines.
How long does lead Service Line Inventory and Replacement Program take?
Plan on Months for inventory; years for replacement from signed proposal to stamped deliverables, longer if a site visit, soil testing or a permit review cycle is involved.
Do I need a licensed PE for lead Service Line Inventory and Replacement Program?
In most US jurisdictions, yes. When the work needs a permit, the plans, calculations or report usually must be sealed by a Professional Engineer licensed in the state where the project is located. Anything we prepare for permit goes to a PE licensed in that state, who reviews and seals it before you submit.
How do I verify an engineer's license in Wisconsin?
Engineers practicing in Wisconsin are licensed by the Wisconsin Examining Board of Architects, Landscape Architects, Professional Engineers, Designers and Professional Land Surveyors. You can confirm a license number and its status in the board's public license search before you sign a contract.
How deep is the frost line in Wisconsin?
Wisconsin Uniform Dwelling Code SPS 321.16 requires footings to be below frost penetration or at least 48 inches below adjacent grade, whichever is deeper (one and two family dwellings). Local building departments set the required footing depth, so confirm the exact figure for your county before designing foundations or retaining walls.
Which building code applies in Wisconsin?
IBC 2021 statewide for commercial buildings; one and two family dwellings use the state Uniform Dwelling Code instead of the IRC (ICC adoption chart, April 2026). Cities and counties can add local amendments, which is one reason to hire an engineer who works in your area.