What the work involves
Pond design covers site suitability, soils for water retention, embankment design, principal and emergency spillways, and outlet pipes. Larger embankments may be regulated dams under state dam safety programs, requiring an engineer's design and periodic inspections. The USDA NRCS publishes widely used pond design guidance (Agriculture Handbook 590).
Local conditions we plan for
- Deep frost penetration
- Expansive clay soils (Pierre Shale)
- Riverine flooding
- Snow and wind loads
Building code: 2021 IBC/IRC adopted at the state level (ICC adoption chart, April 2026). A legislative summary reports adoption of the 2024 IBC and IRC effective July 1, 2026.
When you need it
- Building a farm or recreational pond
- Embankment height or storage may be state-regulated
- Existing pond leaks or spillway erodes
- Dam safety agency orders inspection or repair
Frequently asked questions
How much does pond and Small Dam Design cost?
Across the US, pond and Small Dam Design usually costs $2,000 to $30,000. Estimate. Small unregulated ponds are at the low end; state-regulated dams cost far more.
How long does pond and Small Dam Design take?
Plan on 3 to 12 weeks from signed proposal to stamped deliverables, longer if a site visit, soil testing or a permit review cycle is involved.
Do I need a licensed PE for pond and Small Dam Design?
In most US jurisdictions, yes. When the work needs a permit, the plans, calculations or report usually must be sealed by a Professional Engineer licensed in the state where the project is located. Anything we prepare for permit goes to a PE licensed in that state, who reviews and seals it before you submit.
How do I verify an engineer's license in South Dakota?
Engineers practicing in South Dakota are licensed by the South Dakota Board of Technical Professions.
Which building code applies in South Dakota?
2021 IBC/IRC adopted at the state level (ICC adoption chart, April 2026). A legislative summary reports adoption of the 2024 IBC and IRC effective July 1, 2026. Cities and counties can add local amendments, which is one reason to hire an engineer who works in your area.
What site problems do engineers see most in South Dakota?
Common issues include deep frost penetration, expansive clay soils (Pierre Shale), riverine flooding and snow and wind loads.