North Carolina

LOMA, LOMR-F and LOMR Flood Map Changes

Engineering and survey support to remove a property from a FEMA flood zone or revise a flood map.

Typical US fee$500 to $50,000
Typical timelineLOMA: about 60 days of FEMA review after a complete submittal; LOMR: several months or more
Licensing boardNorth Carolina Board of Examiners for Engineers and Surveyors

What the work involves

A Letter of Map Amendment (LOMA) removes a structure or lot that is naturally above the base flood elevation, while a LOMR-F covers areas raised by fill, and a Letter of Map Revision (LOMR) changes flood hazard information based on new modeling or projects. LOMAs often need only survey elevation data, while LOMRs require hydraulic modeling by an engineer. FEMA charges no fee to review a LOMA but charges flat fees for most LOMR-F and conditional requests.

Local conditions we plan for

  • Hurricanes, storm surge and coastal flooding
  • Inland flooding (Hurricane Helene, western North Carolina)
  • Landslides on steep mountain slopes
  • Expansive clay soils in the Piedmont

Building code: 2021 IBC/IRC adopted at the state level (ICC adoption chart, April 2026).

When you need it

  • Lender requires flood insurance but the house sits on high ground
  • Lot raised with fill (LOMR-F)
  • Development or channel project changes the floodplain (CLOMR and LOMR)
  • Flood map appears inaccurate for a property

Frequently asked questions

How much does lOMA, LOMR-F and LOMR Flood Map Changes cost?

Across the US, lOMA, LOMR-F and LOMR Flood Map Changes usually costs $500 to $50,000. Estimate. A simple LOMA can be a few hundred dollars of survey work plus no FEMA fee; FEMA's fee schedule lists single-lot LOMR-F reviews at $425 online and $525 paper. Full LOMRs with hydraulic modeling can cost tens of thousands of dollars.

How long does lOMA, LOMR-F and LOMR Flood Map Changes take?

Plan on LOMA: about 60 days of FEMA review after a complete submittal; LOMR: several months or more from signed proposal to stamped deliverables, longer if a site visit, soil testing or a permit review cycle is involved.

Do I need a licensed PE for lOMA, LOMR-F and LOMR Flood Map Changes?

In most US jurisdictions, yes. When the work needs a permit, the plans, calculations or report usually must be sealed by a Professional Engineer licensed in the state where the project is located. Anything we prepare for permit goes to a PE licensed in that state, who reviews and seals it before you submit.

How do I verify an engineer's license in North Carolina?

Engineers practicing in North Carolina are licensed by the North Carolina Board of Examiners for Engineers and Surveyors. You can confirm a license number and its status in the board's public license search before you sign a contract.

Which building code applies in North Carolina?

2021 IBC/IRC adopted at the state level (ICC adoption chart, April 2026). Cities and counties can add local amendments, which is one reason to hire an engineer who works in your area.

What site problems do engineers see most in North Carolina?

Common issues include hurricanes, storm surge and coastal flooding, inland flooding (Hurricane Helene, western North Carolina), landslides on steep mountain slopes and expansive clay soils in the Piedmont.

Cities we serve

Full service details →   State requirements →