Wisconsin
Green Infrastructure and Rain Garden Design
Design of rain gardens, bioswales, permeable pavement and infiltration systems to meet stormwater rules or reduce runoff.
What the work involves
Green infrastructure manages runoff close to where it falls using infiltration and vegetation. Engineers check soil infiltration rates, size practices, design overflows and coordinate planting with landscape architects. Many municipal stormwater rules now prefer or require these practices, and some offer stormwater fee credits.
Local conditions we plan for
- Deep frost penetration
- Heavy snow loads
- Great Lakes shoreline erosion
- Karst in the southwest Driftless Area and Door County
Building code: IBC 2021 statewide for commercial buildings; one and two family dwellings use the state Uniform Dwelling Code instead of the IRC (ICC adoption chart, April 2026).
When you need it
- Stormwater rules require runoff reduction
- Stormwater utility fee credit program
- Limited space for a detention pond
- Homeowner wants to reduce yard runoff
Frequently asked questions
How much does green Infrastructure and Rain Garden Design cost?
Across the US, green Infrastructure and Rain Garden Design usually costs $1,500 to $25,000. Estimate. Residential rain gardens are at the low end; commercial permeable pavement and bioretention at the high end.
How long does green Infrastructure and Rain Garden Design take?
Plan on 2 to 8 weeks from signed proposal to stamped deliverables, longer if a site visit, soil testing or a permit review cycle is involved.
Do I need a licensed PE for green Infrastructure and Rain Garden Design?
In most US jurisdictions, yes. When the work needs a permit, the plans, calculations or report usually must be sealed by a Professional Engineer licensed in the state where the project is located. Anything we prepare for permit goes to a PE licensed in that state, who reviews and seals it before you submit.
How do I verify an engineer's license in Wisconsin?
Engineers practicing in Wisconsin are licensed by the Wisconsin Examining Board of Architects, Landscape Architects, Professional Engineers, Designers and Professional Land Surveyors. You can confirm a license number and its status in the board's public license search before you sign a contract.
How deep is the frost line in Wisconsin?
Wisconsin Uniform Dwelling Code SPS 321.16 requires footings to be below frost penetration or at least 48 inches below adjacent grade, whichever is deeper (one and two family dwellings). Local building departments set the required footing depth, so confirm the exact figure for your county before designing foundations or retaining walls.
Which building code applies in Wisconsin?
IBC 2021 statewide for commercial buildings; one and two family dwellings use the state Uniform Dwelling Code instead of the IRC (ICC adoption chart, April 2026). Cities and counties can add local amendments, which is one reason to hire an engineer who works in your area.