Wisconsin

Culvert Design and Replacement

Hydraulic design of culverts under roads and driveways, including fish passage and replacement of failing pipes.

Typical US fee$2,000 to $40,000
Typical timeline2 to 12 weeks plus permits
Licensing boardWisconsin Examining Board of Architects, Landscape Architects, Professional Engineers, Designers and Professional Land Surveyors

What the work involves

Engineers size culverts from watershed hydrology and hydraulic analysis using FHWA guidance, check headwater depth and outlet velocity, and design inlet and outlet protection against erosion. Many states require stream crossings to allow fish and aquatic organism passage, which often means larger or open-bottom structures. Failing culverts can cause road washouts and sinkholes, so condition assessment is part of the work.

Local conditions we plan for

  • Deep frost penetration
  • Heavy snow loads
  • Great Lakes shoreline erosion
  • Karst in the southwest Driftless Area and Door County

Building code: IBC 2021 statewide for commercial buildings; one and two family dwellings use the state Uniform Dwelling Code instead of the IRC (ICC adoption chart, April 2026).

When you need it

  • Road or driveway crossing a stream
  • Culvert overtops during storms
  • Rusted, crushed or separated culvert
  • State requires fish passage at a stream crossing
  • Sinkhole forming over a pipe

Frequently asked questions

How much does culvert Design and Replacement cost?

Across the US, culvert Design and Replacement usually costs $2,000 to $40,000. Estimate. Small driveway culverts cost little to design; stream crossings with permits and fish passage cost much more.

How long does culvert Design and Replacement take?

Plan on 2 to 12 weeks plus permits from signed proposal to stamped deliverables, longer if a site visit, soil testing or a permit review cycle is involved.

Do I need a licensed PE for culvert Design and Replacement?

In most US jurisdictions, yes. When the work needs a permit, the plans, calculations or report usually must be sealed by a Professional Engineer licensed in the state where the project is located. Every deliverable we issue for permit is sealed that way.

How do I verify an engineer's license in Wisconsin?

Engineers practicing in Wisconsin are licensed by the Wisconsin Examining Board of Architects, Landscape Architects, Professional Engineers, Designers and Professional Land Surveyors. You can confirm a license number and its status in the board's public license search before you sign a contract.

How deep is the frost line in Wisconsin?

Wisconsin Uniform Dwelling Code SPS 321.16 requires footings to be below frost penetration or at least 48 inches below adjacent grade, whichever is deeper (one and two family dwellings). Local building departments set the required footing depth, so confirm the exact figure for your county before designing foundations or retaining walls.

Which building code applies in Wisconsin?

IBC 2021 statewide for commercial buildings; one and two family dwellings use the state Uniform Dwelling Code instead of the IRC (ICC adoption chart, April 2026). Cities and counties can add local amendments, which is one reason to hire an engineer who works in your area.

Cities we serve

Full service details →   State requirements →