Michigan

SPCC Plan Certification

Spill Prevention, Control and Countermeasure plans certified by a professional engineer for facilities storing oil.

Typical US fee$1,500 to $10,000
Typical timeline2 to 6 weeks
Licensing boardMichigan State Board of Professional Engineers

What the work involves

EPA's SPCC rule requires facilities with aboveground oil storage over 1,320 gallons (counting containers of 55 gallons or more) that could reasonably discharge to navigable waters to prepare and implement a spill plan. Most plans must be reviewed and certified by a licensed professional engineer, though some smaller qualified facilities may self-certify. Plans cover containment, inspections, training and response.

Local conditions we plan for

  • Frost depth and freeze thaw damage to roads
  • Great Lakes shoreline erosion and fluctuating lake levels
  • Heavy lake effect snow loads
  • Aging water and stormwater infrastructure

Building code: 2021 IBC and 2015 IRC adopted at the state level (ICC adoption chart, April 2026).

When you need it

  • Aboveground oil storage over 1,320 gallons
  • Farms, fleets, construction yards, utilities
  • Five-year plan review due
  • Changes to tanks or containment

Frequently asked questions

How much does sPCC Plan Certification cost?

Across the US, sPCC Plan Certification usually costs $1,500 to $10,000 per facility. Estimate. Small farm or fleet plans are at the low end; multi-tank industrial facilities cost more.

How long does sPCC Plan Certification take?

Plan on 2 to 6 weeks from signed proposal to stamped deliverables, longer if a site visit, soil testing or a permit review cycle is involved.

Is a permit required for sPCC Plan Certification?

Often not on its own, but the findings frequently lead to work that does need a permit. We tell you which parts of the follow-up work your local building department will review, and can prepare those drawings too.

How do I verify an engineer's license in Michigan?

Engineers practicing in Michigan are licensed by the Michigan State Board of Professional Engineers. You can confirm a license number and its status in the board's public license search before you sign a contract.

Which building code applies in Michigan?

2021 IBC and 2015 IRC adopted at the state level (ICC adoption chart, April 2026). Cities and counties can add local amendments, which is one reason to hire an engineer who works in your area.

What site problems do engineers see most in Michigan?

Common issues include frost depth and freeze thaw damage to roads, great Lakes shoreline erosion and fluctuating lake levels, heavy lake effect snow loads and aging water and stormwater infrastructure.

Cities we serve

Full service details →   State requirements →