South Dakota

Property Condition Assessment (PCA)

ASTM E2018 property condition assessments for buyers and lenders of commercial and multifamily property.

Typical US fee$1,500 to $10,000
Typical timeline2 to 4 weeks
Licensing boardSouth Dakota Board of Technical Professions

What the work involves

A PCA evaluates a commercial or multifamily property's building systems, structure, site, paving and drainage, and estimates immediate and long-term repair costs. It follows the ASTM E2018 standard and is commonly required by commercial lenders. Engineers and architects lead the assessment, often with specialists for roofing, mechanical and electrical systems.

Local conditions we plan for

  • Deep frost penetration
  • Expansive clay soils (Pierre Shale)
  • Riverine flooding
  • Snow and wind loads

Building code: 2021 IBC/IRC adopted at the state level (ICC adoption chart, April 2026). A legislative summary reports adoption of the 2024 IBC and IRC effective July 1, 2026.

When you need it

  • Buying or refinancing commercial property
  • Lender requires a PCA
  • Capital planning for a portfolio
  • HOA reserve planning

Frequently asked questions

How much does property Condition Assessment (PCA) cost?

Across the US, property Condition Assessment (PCA) usually costs $1,500 to $10,000 per property. Estimate. Depends on building size and complexity.

How long does property Condition Assessment (PCA) take?

Plan on 2 to 4 weeks from signed proposal to stamped deliverables, longer if a site visit, soil testing or a permit review cycle is involved.

Is a permit required for property Condition Assessment (PCA)?

Often not on its own, but the findings frequently lead to work that does need a permit. We tell you which parts of the follow-up work your local building department will review, and can prepare those drawings too.

How do I verify an engineer's license in South Dakota?

Engineers practicing in South Dakota are licensed by the South Dakota Board of Technical Professions.

Which building code applies in South Dakota?

2021 IBC/IRC adopted at the state level (ICC adoption chart, April 2026). A legislative summary reports adoption of the 2024 IBC and IRC effective July 1, 2026. Cities and counties can add local amendments, which is one reason to hire an engineer who works in your area.

What site problems do engineers see most in South Dakota?

Common issues include deep frost penetration, expansive clay soils (Pierre Shale), riverine flooding and snow and wind loads.

Cities we serve

Full service details →   State requirements →