What the work involves

Temporary works carry real loads and fail without warning when underdesigned. Engineers check ground bearing for crane outriggers and pads, design crane mats, temporary bracing of walls and steel, falsework, formwork, and construction access structures, often working with a geotechnical engineer.

Local conditions we plan for

  • Wasatch Fault seismic hazard
  • Liquefiable lake sediments along the Wasatch Front
  • Landslides and debris flows
  • Collapsible and expansive soils

Building code: 2021 IBC/IRC adopted at the state level (ICC adoption chart, April 2026).

When you need it

  • Mobile or tower crane on uncertain ground
  • Crane setting near basement walls or utilities
  • Tall masonry or tilt-up walls needing temporary bracing
  • Falsework or shoring for concrete

Frequently asked questions

How much does crane Pad and Temporary Works Design cost?

Across the US, crane Pad and Temporary Works Design usually costs $1,000 to $15,000. Estimate. A single crane pad check is low cost; complex temporary works packages are higher.

How long does crane Pad and Temporary Works Design take?

Plan on Days to 3 weeks from signed proposal to stamped deliverables, longer if a site visit, soil testing or a permit review cycle is involved.

Do I need a licensed PE for crane Pad and Temporary Works Design?

In most US jurisdictions, yes. When the work needs a permit, the plans, calculations or report usually must be sealed by a Professional Engineer licensed in the state where the project is located. Every deliverable we issue for permit is sealed that way.

How do I verify an engineer's license in Utah?

Engineers practicing in Utah are licensed by the Utah Professional Engineers and Professional Land Surveyors Licensing Board. You can confirm a license number and its status in the board's public license search before you sign a contract.

Which building code applies in Utah?

2021 IBC/IRC adopted at the state level (ICC adoption chart, April 2026). Cities and counties can add local amendments, which is one reason to hire an engineer who works in your area.

What site problems do engineers see most in Utah?

Common issues include wasatch Fault seismic hazard, liquefiable lake sediments along the Wasatch Front, landslides and debris flows and collapsible and expansive soils.